E & H Baxendale Ltd are designers and manufacturers of trussed rafters and easi-joist the metal web floor joist system from Wolf Systems Ltd.

Delivery

Deliveries are usually made 5 to 10 days from receipt of payment and confirmation of sizes. Terms & Conditions of Sale apply.

easi-joist

This project used easi-joist to form stud walls and then used cantilevered trussed rafters to form the roof. Full portfolio page coming soon.

easi-joist

easi-joist are metal web joists that can be used to form walls, floors, flat & pitched roofs.

Trussed Rafters

Want to make the most of your roofspace, then Room in the Roof (RiR), attic trusses are just what you are looking for.

Home » Blog Home » Archive by tag 'lytham quays'
Bookmark and Share

Building the villa’s the easi-way

Today we delivered the easi-joist floor package and trussed rafter roof package for another Kensington Developments Villa, bringing the total delivered so far to 9.  We actually visited the site to measure up for the next set of garages, and whilst we were there, we found out that the first two villa’s which are nearing completion are to be handed to over to their owners in four weeks time.

To find out more about easi-joist visit the flooring section of our main site and to find out more about the Villa Collection at Lytham Quays visit the Kensington Developments page in our portfolio section of our website.


Building the Villa’s the easi-way

Kensington Developments at Lytham Quays have ordered another attic garage for their Villa development bringing the total of garages they have ordered to four.


Building the Villa’s the easi-way

Yesterday we completed manufacturing the easi-joist floor for the 9th Villa at Kensington Developments Lytham Quays development, each floor package contains a total of 126 joists ranging in span from around 1.5m to 6m giving a total of 601.1m of joists.

To date we have manufactured a total of 5409.9m of easi-joist for the Lytham Quays site or to put it another way we have manufactured enough easi-joist to cover just over 3 miles if laid end to end.

If you would like to find out more about the Villa Collection at Lytham Quays or view an interactive 3D model (PDF) of the floor or find out more about easi-joist why not visit our main website.


Building the villa’s the easi-way

Today two roof trussed rafter packages were delivered, the easi-joist floor packages were delivered back in April, we have also begun manufacturing a further easi-joist floor package bringing the total of villa’s in progress to nine. To find out more about the Villa Collection at Kensington Developments Lytham Quays site why not visit the Kensington page in our Portfolio section.


Building the villa’s the easi-way

Last week we visited Kensington Developments Lytham Quays site to have a look at their Villa collection, for which we have been supplying the easi-joist metal web floor joist packages and trussed rafter roof packages. 

Each villa requires approximately 120 joists and 123 trussed rafters and 129 lengths of infill timber. To date we have supplied eight floor and roof packages and Kensington's plan to build a total of sixteen Villa's.

To find out more about the villas by visiting our main site at http://www.eandhbaxendale.com/kensington.html

To find out more about easi-joist visit our main site at http://www.eandhbaxendale.com/easi-joist.html


Building the villa’s the easi-way

Interactive 3D model of easi-joist villa floor

Interactive 3D model of easi-joist villa floor

Today we delivered a further two easi-joist floor packages, 126 easi-joists per Villa, to Kensington Development’s Lytham Quays Villa’s development, bringing the total so far to eight out of sixteen Villas. Also part of the delivery were two attic roof’s which are for the garages for the first two villa’s which were delivered back in October.

A new feature on this website is the ability to view interactive 3D PDF’s, you can open the PDF of the easi-joist floors used on the Villa’s by clicking on the image.


Building the villa’s the easi-way

Kensington Villa The Downham 3D Roof & Floor

Kensington Villa 'The Downham' 3D Roof & Floor

In early October E & H Baxendale Ltd supplied a complete easi-joist floor and roof package for the prestigious Villas at Kensington Developments Lytham Quays development. By the end of 2008 we had supplied 6 easi-joist floor packages and 4 roof packages for the development.

Today we delivered the first of 2 further Villa roof packages which Kensington Developments ordered in November. This leaves 10 further villas still to be built on site, with each villa containing approximately 100 joists each as well as a large number of roof trusses and infill timbers.

Given the current economic climate Kensington Developments along with many house builders are currently only building to order, so as of yet we don’t know when the next orders will be placed.

easi-joist is a metal web floor system designed for engineered floor applications and boasts quality performance, ease of use and design versatility. The open web system ensures there is no need to notch or drill for services. easi-joist was the first metal web floor system to have gained Robust Detail Approval, Irish Agrément Board Certification and European Technical Approval.


Building the villa’s the easi-way

Kensington Villa Roof & Floor 3D

Kensington Villa Roof & Floor 3D

In early October E & H Baxendale Ltd supplied a complete easi-joist floor and roof package for the prestigous Villas at Kensington Developments Lytham Quays development. To date we have supplied a total of 4 easi-joist floor and roof packages for the development.

Today Kensington Developments placed an order for a further 2 Villas (out of a total of 16 on the site) to be delivered over the next month or so. Each villa contains approximately 100 joists each as well as a large number of roof trusses and infill timbers.

easi-joist is a metal web floor system designed for engineered floor applications and boasts quality performance, ease of use and design versatility. The open web system ensures there is no need to notch or drill for services. easi-joist was the first metal web floor system to have gained Robust Detail Approval, Irish Agrément Board Certification and European Technical Approval.